PHOTO BY L.RODDA FOR NATOMASBUZZ.COM |
Work resumed this month on the new bicycle and pedestrian overcrossing of Interstate 80 to connect North and South Natomas.
The project includes a nearly two-block-long bridge over the freeway and an at-grade level bridge across the West Drainage Canal along with new connections to existing bike trails.
Work stopped temporarily in compliance with the environmental guidelines to protect the Giant Garter Snake. Construction is expected to be complete in September.
Speak Your Mind
You must be logged in to post a comment.